The wet lump free mix is then ready for use immediately.Īpply the properly mixed material following normal plastering trade and craftsman practices.

Skim set manual#

Manual mixing or use an electrical mixer to stir for about 2 minutes to obtain a homogeneous paste of suitable consistency. See the table for recommended mixing ratio.

Skim set install#

Install fiber mesh between RC structural & brick wall, around gap door/window & cuts of M&E conduit line.įor base skim coat, add material to the recommended amount of clean water by weight or by volume. Make sure squareness, horizontal & verticality. If surface still have defect should rectify first. Prepare material, water & electric supply and plan for works.ĭouble check the structural/wall surface evenness & flatness, thickness. Provide necessary warning barriers surrounding the work place for safety and security purposes. Skim Coating Works For Column/Wall Podium & Internal Wall Tower Mixing will be by hand or using power mixer. Ensure each mix is of similar uniform consistency as previous mixes. Mixing: Mixing of ready mix skim coat shall be strictly in accordance with the procedures set down by the manufacturer. Make good completed R.C structure in order to receive skim coat.Ĭlean the area for safe working space and suitable accessibility.įiber mesh will be installed before applying skim coat for joint area between ceiling and wall or RC wall and brick wall to avoid cracks. Slab soffit must be free from timber/formwork, dust oil, paint, grease and other foreign materials which may affect the site construction and finishing. Surface of slab soffit and R.C wall including inner angles must be sufficiently flat, taking into consideration the permissible minimum and maximum thickness of the skim coat.Īny slab, soffit or wall which exceeds the permissible limit shall be hacked and make good. The surface of RC wall will be checked using 1″x 2″ aluminium bar and angle rule to determine if any additional patching or hacking is required for achieving the squareness and verticality.

skim set

Protection of window and door frames to be done and relevant contractors shall be available during the skim coating works.Īll opening, holes, cracks must be properly filled by responsible contractor before commencement of skim coat work. Make sure that all required M&E concealed services and openings such as electrical conduits, window and door frames have been installed. Obtain relevant approvals for the construction drawings & materials from Architect/Client. Preparation Of Surfaces / Walls for Skim Coat Material delivery and storage areas should have enough space and lighting to allow for the safe movement of materials.Īlways use the suitable tools /equipment for the job.Ĭheck cable and connections of power tools for any wear/tear of insulation and loose connection.īelow is details of necessary materials and tools: All workers to continually use PPE ( Personal Protective Equipment).Įstablish a clear access, egress way to allow for the safe movement of materials and equipment around the site.